Promoting a Design from Staging to Prod

Learn how to move a design from a staging workspace to a production workspace, with environment assignment and access approval.

This guide walks through how Five promotes the prod-deployment-v2 design from the orbital-staging workspace to orbital-production, with Zara Osei (Infrastructure Team Admin) approving the environment assignment.

See Meet Five and the Cast for the full Orbital Labs narrative reference.

At Orbital Labs, workspaces mirror the deployment pipeline:

WorkspaceEnvironmentTeams with Access
orbital-stagingstaging-aws (EKS + S3 + ElastiCache), staging-azure (AKS + Azure Blob + Azure Service Bus)Infrastructure + Development
orbital-productionprod-aws (EKS + RDS + S3 + CloudFront + SQS), prod-gcp (GKE + Cloud SQL + Cloud Storage + Pub/Sub)Infrastructure only

Five has finished validating prod-deployment-v2 in staging. The design deploys an EKS cluster, an RDS PostgreSQL database, an S3 bucket, and a CloudFront distribution โ€” the core of Orbital Labs’ AWS production platform.

  • You have a design ready in a staging workspace that has been tested and reviewed.
  • You have access to the target production workspace (Infrastructure team membership at Orbital Labs).
  • The production workspace has at least one environment assigned with the target cloud connections.
  1. Navigate to Layer5 Cloud and open the orbital-staging workspace.
  2. Find prod-deployment-v2 in the Designs tab.
  3. Open the design and confirm it is in the expected state โ€” all components connected, no validation errors.

Designs belong to exactly one workspace at a time. To promote the design, transfer it.

  1. From the design’s menu (โ‹ฎ), click Move to Workspace.
  2. Select orbital-production from the workspace list.
  3. Confirm the transfer.

With prod-deployment-v2 now in orbital-production, assign the environment where it will deploy.

  1. Open the design in orbital-production.
  2. Click Deploy and select the target environment โ€” in this case, prod-aws.
  3. Review the connection list: EKS cluster, RDS (PostgreSQL), S3, CloudFront, SQS.

If your organization requires Team Admin approval before production deployments, Zara receives a review request.

  1. Zara opens the pending deployment request in her notifications.
  2. She reviews the design diff and the target environment.
  3. She clicks Approve โ€” the deployment proceeds to prod-aws.

After approval:

  1. Navigate to the Deployments tab in orbital-production.
  2. Confirm that prod-deployment-v2 shows a Deployed status against prod-aws.
  3. Verify the connected resources (EKS, RDS, S3, CloudFront, SQS) show healthy connection status.
  • To give the Development team visibility into the production design (read-only), Five can share the design individually with Rex and Jordan. See Sharing a Workspace.
  • To set up a parallel deployment to prod-gcp, Five repeats Steps 3โ€“5 selecting prod-gcp as the environment.
  • To roll back, Five transfers prod-deployment-v2 back to orbital-staging and deploys the previous version from there.

Related Reading